Last edities (CostandValue)

Last edities (CostandValue)

Last edities (CostandValue)

Jaargang 5 - nummer : 10
CaV_ Okt 2016_Cover_HR
Click on the cover to read the full magazine.  
  • Contramal Supports the A9 Amstelveen Project
  • Alliance Contracts in Civil Engineering and Infrastructure
  • Cost and Schedule Control
  • The Value of Probabilistic Risk Analysis for Value Management

Jaargang 5 - nummer : 9Screenshot C_V 9

Click on the cover to read the full magazine.  

  • Opportunity Framing for Infrastructure Projects
  • What Is It Worth?
  • Cost Estimating in the Process Industry
  • Assessing Relational Capability in Projects
  • The Future Lies in Quantitatively Assessing Sustainabilit

Jaargang 4 - nummer 8:

Cover oktober C_v
Click on the cover to read the full magazine.  

  • Applying Value Management (VM) in a Municipal Organisation: Lessons Learned
  • Value Management in Area Development
  • Abnormally Low Tenders (ALT)
  • Project Monitoring and Control
  • No Decision Without Considering Ris

Jaargang 4 - nummer 7:

voorkant c_v 7 2
Click on the cover to read the full magazine.  

  • Economic Life of an Asset
  • A Hidden Gem in Delft
  • Value Engineering & Market Consultation
  • Project Portfolio Management (PPM)
  • Value Engineering in Aircraft Manufacturing
  • Costs of Flood Defences
  • Is Probabilistic Cost Estimating a Science?

Jaargang 3 - nummer 6:voorkant c_v 6

Click on the cover to read the full magazine.  

  • Chasing Affordability with Parametrics – A Lifetime Perspective
  • Playing It Safe?
  • Providing Quantity, Cost and Weight Assurance on Large Complex Projects
  • DACE Labor Productivity Norms: The New 'Gulf Coast'?
  • Value Analysis for the Netherlands?

Jaargang 3 - nummer 5:CV_cover#5_jrg3

Click on the cover to read the full magazine.  

  • Social Cost-Benefit Analysis of Water Safety in the 21st Century
  • Design to Cost in the Dutch Contracting Industry
  • Value Engineering and the Circular Economy
  • Value Engineering Meets Serious Gaming
  • Quantifying Uncertainties and Risks in Infrastructure Projects
  • Asset Valuation of Infrastructure
  • Combined Value Study Increases the Value of the Eem Ecological Corridor Project

Jaargang 2 - nummer 4:

CV_cover #4-jrg 2          
Click on the cover to read the full magazine.  

  • Design to Cost in the Oil & Gas Industry?
  • Hospital Facilities: Value Creation Is Essential for a Healthy Future
  • Awarding Contracts Based on Value Using Value Methodology
  • Reconstruction of the N302: Biggest Bang for the Buck
  • Measuring Value in Value Engineering Studies
  • Comparison of Piping Calculation Methods
  • DACE Labor Productivity Norms: The New 'Gulf Coast'? Part 1

Jaargang 2 - nummer 3:
Voorblad C_V 3
Click on the cover to read the full magazine.  

  • Assessing Sustainability Using the Eco-Costs/Value Ratio Method
  • Business Case for Sustainable Value Engineering
  • VE Helps Move Forward!
  • Calculating the Environmental Impact of Construction Projects
  • Increasing Benefits by Reducing Costs
  • Success Story: Saving Big on Energy
  • VE Study of the Liempde Grade-Separated Junction: Value Study with LCM Value
  • The Missing Link: Object-Oriented Estimating
  • The Function Dictionary: Function i-Tool
  • DACE Takes the Next Step in Professionalising Value Management: 'Dutch Development Programme for Value Management'

Jaargang 1 - nummer 2:

Cover CAV2

Click on the cover to read the full magazine.

  • An Introduction to Performance-Based Procurement: Give Suppliers Maximum Freedom!
  • Combined Value Analysis Helps Advance the N35 Project
  • Cost Estimating in the Process Industry
  • Applied Cost Structures in the Oil & Gas Industry
  • The Need to Identify the Risks of Software Within Capital Projects: Why Software Matters in Capital Projects
  • Normalising Cost Data from Tunnel Projects
  • Requirements for Risk Assessment

Jaargang 1 - nummer 1:

COSTandVALUE_Cover nummer 1_EDUCOM

Click on the cover to read the full magazine.

  • SSK in Brief
  • Investment Analysis: Return and Risk
  • Cost Engineers Add Value Through an Integrated Approach to BIM
  • Allocating Value Adding Efforts to Contracting Parties
  • Probabilistic Risk Analysis of Cost Estimates
  • Analytical Program Management: An Approach for Integrating Cost, Schedule and Risk

Partners

Close